|
Construction
work was completed on a museum and
memorial for the Public
Security Directorate in the city of Azraq,
southeast of Amman. The museum, which deals with the history
of the Public Security Directorate, has a built up area of 170
square meters and is located on a 7,650 square-meter site. The
memorial, built in commemoration of the Public Security men
killed in the line of duty, incorporates a six-meter high
obelisk on which their names are engraved.
|
|
|
Construction
work was completed on the expansion
of Farah Maternity Hospital in Amman. Tahhan
and Bushnaq Architects, in association with the
medical consultant Llewelyn - Davis,
designed the 8,200 square-meter expansion of the 960
square-meter existing hospital. The expansion incorporates
eleven stories as well as three basement levels.
|
 |